BUILD SHIPYARD 

NEW BUILDING SHIPYARD

NEW BUILDING SHIPYARD FACILITIES

  • Total Area:     60.000m² 
  • Closed Area:  12.000m² 
  • Steel processing capacity:  20.000t 
  • New building capacity:     40.000DWT 
  • Maximum vessel size:     30.000DWT 
  • Slipways:  150m x 42m, 120m x 20m, 110m x 10m 
  • Cranes:     1x 100t,  1x 50t,  3x 15t,  5x 10t,  5x 10t 

Equipment: 

  • CNC Plasma Cutting Machine 600 Ton  
  • Hydraulic Press 100 Ton 
  • Hydraulic Press Profile 
  • Bending Machine 
  • Welding Machines 
  • Electric Arc/Submerged/Inert Gas 

WHY US

⦁ On-time Delivery,
⦁ Efficient – Proactive Planning System,
⦁ Determined And Committed Management Team,
⦁ Experience On Different Type of Vessels,
⦁ Dynamic, Eager and Open-minded Engineering & Technical Teams,
⦁ Qualified Workers, Technicians and Engineers,
⦁ Easy Accessibility to Advanced Sub-suppliers,
⦁ Cost Advantage, (due to order book)
⦁ Specialist Advisors for Sophisticated Turn-key Projects

SHIPYARD FACILITIES 

  • Total Area:     50.000m²  
  • Closed Area:  6.000m² 
  • Steel processing capacity:  5.000t/year  
  • Slipways: 150m x 50m ,130m x 33m 
  • Floating Dock: 184m x 27,2m 
  • TLC:                10.000T 
  • Hatch Cover Repair Area:   10.000m² 
  • Berthing Facilities: 1.000m (Without double berthing) 
  • Dock Cranes: 2 x 7,5t 
  • Mobile Crane:    2 pcs 35t 
  • Workshops: 6 x 200m² 
  • Steel Prefabrication Painting  
  • Blasting Pipe 
  • Outfitting Valve 
  • Hydraulic Shaft 
  • Propeller Electrical Machinery (for shaft pumps / coolers / heaters) 

PRODUCTION RANGE

  • Carbon Composite
  • Steel
  • Aluminum
  • Steel + Aluminum
  • Steel + Carbon Composite Segments
  • Offshore Barges
  • Fishing Vessels / Trawlers
  • Passenger Vessels
  • Chemical Tankers
  • Search & Rescue Boats
  • Carbon Composite Catamarans
  • Fast Offshore Supply & Service Vessels
  • R&D Projects

REFERENCE LIST

PRODUCTION SYSTEM

  • Nesting, CNC cutting, bending, edge preparation works are carried out.
  • Assembling of single parts.
  • Merging of prefabrication products and single parts.
  • Production of flat panels consisting of plate and profiles.
  • Assembling of panels, components, prefabrication products and single parts.
  • Production of units consisting of one or more sections. Before forwarding to slipway, this is the last stage to get into Paint Hallway.
  • Specialized workers at individual work-stations
  • Easier planning and better control of the activities
  • Increased quality by simplifying the processes
  • Reduction in movement of the workers and equipment, reduction in man-hours leading shorter delivery times